ACTIVITIES/PROJECTS | Construction | Infrastructure Projects | METRO

ATHENS METRO LINE 2, AGIOS DIMITRIOS - ELLINIKO EXTENSION

    This Athens METRO extension 5.5km long, includes the construction of a 4,700m main tunnel tube bored by TBM-EPB Boring Machine, of four new Cut & Cover Stations namely Ilioupoli, Alimos, Argyroupoli and Elliniko, seven shafts, a 274m long Cut & Cover train Depot, a 237m long Cut & Cover tunnel, a 211m access tunnel, as well as all E/M works (including Power supply, Traction power,
    HVAC & Tunnel ventilation, Automation, Safety Systems, Telecommunication Systems, PA, CCTV) and Trackworks.